Need
The company needed a roof for the pulp silo capable of withstanding strong winds and allowing pulp overflow without breaking the sheets, using a hinge system.
They also required a walkway between the two silos, capable of bearing not only wind loads and the weight of people, but also a pipe carrying heavy pulp.
Solution
Design, calculation and manufacture of a roof for a 20-meter-high pulp silo. A walkway between the two silos with a 10.40-meter span was also built.
It has been installed in perfect condition since 2003.
All our works are made entirely with structural profiles manufactured by pultrusion in fiberglass composite material (also known as PRFV).
CME has an engineering team that designs, calculates, tests and manufactures all structures built for a large number of important companies in Argentina and several other countries.