Need
They needed to replace the metal structure, which was completely destroyed after only 4 years of installation.
Solution
Design, calculation and manufacture of a two-level structure to support 3 heavy reactors.
It was built entirely with fiberglass composite profiles and has been installed in perfect condition since 2004.
All our works are made entirely with structural profiles manufactured by pultrusion in fiberglass composite material (also known as PRFV).
CME has an engineering team that designs, calculates, tests and manufactures all structures built for a large number of important companies in Argentina and several other countries.
CME has an engineering team that designs, calculates, tests and manufactures all structures built for a large number of important companies in Argentina and several other countries.
